Experience & Completed Works
Project Experience & Completed Works
Work in the name of NDC (Participation Share 100%)
| Sr No. | Name of Project/ Work | % Participation | Date of start / appointed date of project | Value of contract as per Agreement / LOA Rs. In Crore |
|---|---|---|---|---|
| 1 |
Construction of Foundation, Substructure & Superstructure for Composite
Girder Bridge Nos. 207 (Span: 5x12.2m) at Km: 182/R-8 & 208 (Span: 12x12.2m)
at Km: 183/2-3 and Construction of Bridge No. 209 (Span: 5x6.3m) JPSC slab,
at Km: 184/2-3, including shifting of existing proposed 3rd Line between
Narayangarh - Bhadrak Section of S. E. Railway
LOA NO. SER/CON ORGN/HQ/TENDER/4135/6891 dt. 13-11-2019 |
100% | 13-11-19 | 42.88 |
| 2 |
Proposed rebuilding of through type OWG of span 2x30.5m at existing
br.no.603 at 280/6-7 with permanent diversion section KTPR-LOB
LOA No: NER HQ-ENG./D2PL 232021MLG/00959810052019 DATED 31-03-2022 |
100% | 31-03-22 | 1.94 |
| 3 |
Construction of major Bridge no.44(5x18.3m span) composite girder on
Garisandra river, Bridge no 71(3x18.3m span) composite girder on Guhar
nallah,br.no.88(5x18.3m span)composite girder on Barmi river and br. No.
139(3x18.3m span)composite girder on Ved nala
LOA NO: DYCE-C-GWL-ENGINEERING/ENQ6 GWL 1220/0095810030469 DATED 04-01-2021 |
100% | 04-01-21 | 33.8 |
| 4 |
Construction of 6-lane flyover at Satyasai intersection in Indore city in
the State of Madhya Pradesh on EPC mode
LOA 7054/615/MPRDC/Proc/Fob/2023 Dt. 14/08/2023 |
100% | 15-03-24 | 62.44 |
| 5 |
Construction of 6-lane flyover at IT intersection in Indore city in the
State of Madhya Pradesh on EPC mode
LOA 7056/615/MPRDC/Proc/Fob/2023 Dt. 14.08.2023 |
100% | 15-03-24 | 63.32 |
| 6 |
Construction of 4-lane flyover at Indorama Chowk near Sri Ram Mandir on Mhow
Ghat Bypass State Highway 3B, Km No. 20/8 in the District Indore, State of
Madhya Pradesh on EPC mode
LOA 9514/615/MPRDC/Proc/Fob/2023 Dt. 03.10.2023 |
100% | 23-01-24 | 38.48 |
| 7 |
Construction of H.L. Bridge over 'GOBARI' at 11th km on Marshagha - Jamboo
road to Chandbali Village to connecting or Ta-Bandhi via: Bijaynagar,
Kendrapara(SH-19)
LOA: 23452, dated: 01.06.2023 |
100% | 13-11-23 | 37.94 |
| 8 |
Construction of ROB & its approaches in between Majhauliya & Bettiah Railway
Station in lieu of L.C. No-188 in Bettiah Sarisawa of West Champaran
District
LOA No. BRPNNL/ Champaran/81 dated 27.01.2024 |
100% | 08-06-24 | 40.53 |
| 9 |
Construction of H.L. Bridge over Luna at 5th Km on Belar
Nuagaon-Teragaon-Mahakalapara in the District of Kendrapara for the year
2021-2022 (EPC MODE)
LOA No. 1597 Dated: 11.03.2024 |
100% | 30-08-24 | 77.62 |
| 10 |
At NCB Yard - Pit Line & Sick line at other coaching vehicles.
LOA No: Alipurduar Division-Engineering/65-AP-1-2023/00959810099843 Dated:15.03.2024 |
100% | 15-03-24 | 24.26 |
| 11 |
Construction of High Level RCC Bridge 1113M Approach road 2029 Mtr, Guide
Bund and Protection work over Mahananda River Connecting SH-99 (Baisa) to
NH-31 (Kanki) at Athapour Ghat in the District of Purnea on Engineering,
Procurement & Construction (EPC) Mode.
LOA No. BRPNNL/KTR/COI1/500, DATED 09.03.2024 |
100% | 10-06-24 | 174.32 |
| 12 |
Construction of H.L. Bridge over river Luna near Purbansa at 3rd km on
Kaitalia-Jurur Road in the District of Cuttak under State Plan.
LOA No. 1777 dated 10.05.2023 |
100% | 23-12-25 | 55.18 |
| 13 |
Construction of H.L. Bridge over Chitrpala river at 0.00 km on Bandhpur
Balramur Cuttack road in the District of Cuttack under Biju Setu Yojana.
LOA No. 3194 dated 14-03-2024 |
100% | 12-09-24 | 63.14 |
Works which have been completed in Past
| Sl. No. | Name of Project/Work | Client | Brief Description of work | value of completed work (In Lakh) | Date of Completion |
|---|---|---|---|---|---|
| 1 | Construction of ROBs in Bihar including substructure & superstructure only for railway span ROBs in lieu of LC No.SJ-315 & Sk-316, Kishanganj (Package-XV) | Project Director, Ircon International Limited, BiharRajyaPulNirman Nigam Ltd | Piles (span 35 M & 45 M) | 799.25 | 30.06.2011 |
| 2 | Construction of High Level Bridge (5x22.75 M) over River Baya at Bochahaghat in the district of Samastipur | Works Division Darbhanga | Well foundation | 485.02 | 07.08.2011 |
| 3 | Construction of two nos. pile foundation bridge at KM 16.459 (2x21M) and KM 13.199 (8x21M) including earthwork in embankment approaches (50 M on either side of two-lane road between Lahariasarai and Hanuman Nagar (Ch. 0.000 to 16.471KM) of SH-50 in the state of Bihar (Package – III) | Project Director Ircon International Limited | Pile Foundation, 24 Nos. RCC girder precast and launched | 1526.46 | 31.03.2012 |
| 4 | Construction of three nos. well foundation bridge at KM 10.955 (4x21M), KM 9.515 (5x24) & KM 15.388 (6x22M) including earthwork in embankment approaches (50M on either side) of two lane road between Lahariasarai and Hanuman Nagar (Ch.0.000 to 16.471 KM of SH-50 in the state of Bihar IB (I) | Project Director (RSVY) Ircon International Ltd. | Well foundation, 60 Nos. RCC girder precast and launched | 3692.77 | 31.03.2012 |
| 5 | (B) Construction of New High Level Major Bridge in Replacement of Existing Collapsed Bridge over Balua River in Km 112 of NH 107 | N.H Division Purnea | Well foundation, 30 Nos. RCC girder precast and launched | 1329.54 | 25.09.2012 |
| 6 | Construction of six nos. major bridges on open foundation at ch 42.498 km (5x8m) between Musharimari – Samastipur section of SH-50 Km 8.608 Km (8x7M) Km 15.135 Km, (12x6M), Km 37.175 (4x10M), Km 50.765 (5x10M) & Km 54.375 (5x8m) between Hajipur – Tejpur – Samastipur section of SH-49 and pavement Concrete Work from Ch.0+000 to 1+000 at Lahariasarai (Darbhanga) of SH-50 of Bihar State and miscellaneous work associated with the project (Package – I) | Ircon International Limited | open foundation | 2259.04 | 31.12.2013 |
| 7 | A) Construction of 4x4 lane span H.L.R.C.C Bridge at Ch. Km. 26900 (Sanali) Benipatti – Puri Road at SH-52 in Madhubani Dist. Under RSVY Project Bihar and B) Construction of Multi-cell Culvert at Ch. 203+500 Benipatti to Puri Road at SH-52, in Madhubani Dist. under RSVY Project Bihar and C) Widening of Concrete Road between Gaps of PCC Road and rain water drainage in Madhubani Dist. under RSVY Project Bihar. | Ircon International Limited | open foundation, pile foundation | 1909.61 | 31.03.2014 |
| 8 | Construction of H.L.R.C.C Bridge in 18th km of Bathnaha – Bhimnagar Road in Supaul District, Bihar (PACKAGE NUMBER – WBP/PH/21/2011-12) | World Bank Special Division, BRPNN Ltd. | Well foundation, 12 Nos. RCC girder precast and launched | 346.52 | 28.02.2015 |
| 9 | Construction of H.L.R.C.C Bridge with its approach road in 22nd km of Bathnaha Bhimnagar Road in the District of Supaul (Bihar) (PACKAGE NUMBER: WBP/PH/1/22/2011-12) | World Bank Special Division, BRPNN Ltd. | Well foundation, 18 Nos. RCC girder precast and launched | 589.75 | 03.12.2014 |
| 10 | Construction of H.L.R.C.C Bridge with its approach road in 3rd Km of Balua Baisi road in the District of Supaul (Bihar) (PACKAGE NUMBER: WBP/PH/1/26/2011-12) | World Bank Special Division, BRPNN Ltd. | Pile foundation, 12 Nos. RCC girder precast and launched | 364.16 | 28.02.2015 |